|
Last additions - Tile Laying |
Setting Tiles into Weber AdhesiveHere the adhesive material was laid down first and the tiles were set into it. dozerSep 27, 2011
|
|
More Tiles in PlaceThe outside rows are the guide and red guide lines are used to indicate where each pattern will go. dozerSep 27, 2011
|
|
PatternGetting the pattern right requires the right tiler -- luckily we had the right guy (and gal) for the job.dozerSep 27, 2011
|
|
Drive Way Extra RebarExtra rebar is used in the driveway. One layer of rebar is already there, the tiler will add a second layer which sits in another 5 cm of concrete as he prepares the surface for tiling.dozerSep 27, 2011
|
|
Finished SurfaceThe finished surface prior to acid scrub to remove some signs of cement discoloration. dozerSep 27, 2011
|
|
Cement Grout being AppliedThe grout used is cement mixed with sand. dozerSep 27, 2011
|
|
Fitting a Tile into PlaceA tile is fitted into place using the handle of a regular hammer.dozerSep 27, 2011
|
|
Installing the PattermThe pattern is installed as per the design. dozerSep 27, 2011
|
|
Outer Row with TrimThe tiles are spaced a 1 cm distance. The trim piece has been applied to the edge. Notice the red chalk guide lines have also been laid down. dozerSep 27, 2011
|
|
Outer RowsThese are 'bezen' brand small tiles suitable for driveways and patios. The tiler will be using the outside rows as the basis for the pattern. Here straight lines are being generated using a red chalk string line. dozerSep 27, 2011
|
|
Smoothing the SurfaceThe straight edge tool is used to apply the proper slope to the surface.dozerSep 27, 2011
|
|
Patio TilingFirst the tiler prepares the surface. There will be a slight downward slope to the outside so that any water will drain off. dozerSep 27, 2011
|
|
|
|
|
|