happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction > Cool Thai House Phase 2 > Tile Laying

Last additions - Tile Laying
IMG_2684.jpg
Tile WashingThe tiles are always prepared by immersion in fresh water prior to being laid. dozerSep 27, 2011
DSCN0362.jpg
Finished Granito TilesA finished section of granito floor tiles.dozerSep 27, 2011
DSCN0360.jpg
Finished Bathroom SectionA finished section of the bathroom wall tiles.dozerSep 27, 2011
DSCN0359.jpg
Kitchen Trim TransitionThe kitchen wall tiles transition to the wood trim. dozerSep 27, 2011
DSCN0357.jpg
Glass TilesThe glass tiles under the installed cabinets.dozerSep 27, 2011
DSCN0354.jpg
Aluminum TrimOn the driveway we used aluminum trim edging.dozerSep 27, 2011
DSCN0352.jpg
Bezen Tiles PatioThe patio tiles have held up well so far. dozerSep 27, 2011
DSCN0350.jpg
Bezen Tiles DrivewayThe driveway tiles.dozerSep 27, 2011
IMG_2686.jpg
Tile Spacer GuideA tile is used as a spacer guide to ensure the proper distance between tiles.dozerSep 27, 2011
IMG_2913.jpg
Scrubbing the TilesThe tiles are scrubbed with an acid mix to remove any cement residue. Later they will be treated with a silicone protectant. dozerSep 27, 2011
IMG_2821.jpg
Setting an EdgeA edge is placed on the step up into one of the storage rooms.dozerSep 27, 2011
IMG_2819.jpg
Grouting the SurfaceA cement mix is applied over the top of the tiles and then sponged off to set the grout in place.dozerSep 27, 2011
35 files on 3 page(s) 1

Debug Info 
Debug Output: show / hide