|
Last additions - Ceiling |
Aluminum Rail FrameworkInstalling the rail framework. The rails are run to form sections to support the smart board ceiling sections. The suspended framework is supported by aluminum strips affixed to the roof structure. dozerSep 27, 2011
|
|
Exterior Ceiling FrameInstalling the horizontal members of the aluminum frame on the exterior of the house. dozerSep 27, 2011
|
|
Setting in the Cross SupportsSetting the cross supports into place for the exterior ceiling.dozerSep 27, 2011
|
|
Taping a JointTaping a joint on the interior ceiling. The joints are taped, plastered and sanded for a smooth finish. dozerSep 27, 2011
|
|
Plastering after TapeThe taped joints are plastered and then later sanded. The screw heads are plastered as seen with the white spots. dozerSep 27, 2011
|
|
Service EntryThe prefab service entries (Chang Brand) are more expensive than just doing one up out of spare drywall sheeting but they are more durable and after using them prefer them to just the home made versions. They are two pieces, frame and opening and come in various sizes, this one the openings are 60 x 60.dozerSep 27, 2011
|
|
Ceiling after PlasterThe interior ceiling after taping and plastering prior to finishing sanding. dozerSep 27, 2011
|
|
Installing Service EntryInstalling the service entry. BTW it wasn't the installer that recommended these, think they are seldom used but they certainly are worth the few extra baht. dozerSep 27, 2011
|
|
Drywall Piece InstallationA piece of drywall sheeting is installed. We used Chang brand and water resistant in the bathrooms. dozerSep 27, 2011
|
|
Drywall SheetingA room after the sheeting is affixed to the frame work, prior to taping, plastering and sanding. This particular room doesn't have a step. dozerSep 27, 2011
|
|
Level Establish for Outer StepThe level is established for the outer step (60cm wide x 15cm high) as a first step in putting into place the frame work. Notice that these aluminum L shape pieces used for ties work much better than any type of wire. dozerSep 27, 2011
|
|
Drywall Sheeting AppliedThe drywall sheeting is affixed to the upper level of the interior ceiling. It is screwed into place using 1 1/4" sheetrock screws. dozerSep 27, 2011
|
|
|
|
|
|