happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > User galleries > chiyman > Chiyman's Low Cost House - Part 3 - First Floor beams and slab

Last additions - Chiyman's Low Cost House - Part 3 - First Floor beams and slab
DSCF5046.JPG
Finishing the first floor slab concretechiymanJan 18, 2011
DSCF5047.JPG
Finishing the concrete pour of the First Floor slab. All concrete was lifted by the bucket load to the first floor using the pully. At about 10kg a load the number of movements was considerable!!chiymanJan 18, 2011
DSCF5030.JPG
Unloading Precast concrete slabschiymanJan 18, 2011
DSCF5029.JPG
Pre Cast Concrete slabs being unloaded directly to the first floor beamschiymanJan 18, 2011
DSCF5028.JPG
First Floor Concrete beams with partial removal of formwork ready for receiving the precast first floor slabs. I was very happy with the quality of the beams.chiymanJan 18, 2011
DSCF5027.JPG
Precast slab delivery/unloadingchiymanJan 18, 2011
DSCF5026.JPG
Pre cast concrete slabs used to form the first floor being deliveredchiymanJan 18, 2011
DSCF5040.JPG
A hoist put in position for lifting concrete to first floor for final casting of the first floor slab on top of the precast slabs.chiymanJan 18, 2011
DSCF5039.JPG
Precast Slabs placed and formwork ready for pouring 50mm cover of concretechiymanJan 18, 2011
DSCF5038.JPG
Placing the first floor pre cast slabs, removal of first floor beam formwork and placement of first floor slab mesh reinforcement.chiymanJan 18, 2011
DSCF5037.JPG
Precast slabs in place forming the first floor - note the hole left is for the stairwell.chiymanJan 18, 2011
DSCF5031.JPG
Lifting the precast ploor slabs into position on the first floor beams
chiymanJan 18, 2011
17 files on 2 page(s) 1