July 1The finishing stages of placing the driveway curbingpklongballJul 09, 2009
|
|

July 6We had a pretty heavy rain overnight and this is the stading water from that storm. We will need to re-grade this area to drain a bit better. Tractor man promised us some available time yet.pklongballJul 09, 2009
|
|

July 6Double width pad area for the two compressorspklongballJul 09, 2009
|
|

July 6Compressor and electric wiring for the guest bedroom AC and the living room ACpklongballJul 09, 2009
|
|

July 6Outdoor location of the master bedroom AC compressor. This spot will be filled with concrete for the pad areapklongballJul 09, 2009
|
|

June 30The delivery of the curbing for the driveway. 105 each of the 50 cm long precast blockspklongballJul 05, 2009
|
|

June 30The delivery of the precast curbing for the gravel drivewaypklongballJul 05, 2009
|
|

June 28Gravel truck one of threepklongballJun 28, 2009
|
|

June 28Here is the first load of gravel that will line the driveway. I am expecting two trucks for sure and maybe a third. The dirt man will decide if the 3rd is needed when he levels it and compacts it.pklongballJun 28, 2009
|
|

June 28Here is a view of the JCB loading the small dump truck with the junk dirt and other construction debris and weeds.pklongballJun 28, 2009
|
|

June 28Mrs PK starting a dig. I hope she finds a pot of goldpklongballJun 28, 2009
|
|

June 28Mrs PK digging in the dirt. She wants to move some small plants and other stuff from our rental house.pklongballJun 28, 2009
|
|