June 12Just off the balcony the crew added to drain boxes to channel rain water from the roof and the kitchen drain out to the sewer systempklongball
June 12Today's view of the back of the house and the new guttering around the veranda eaves. Once it is painted it will almost be invisiblepklongball
June 12I just had to add this photo of Mrs. PK trying her hand at mixing the mud for the tile crew. She lasted all of 2 minutes before her arms gave out.pklongball
June 12The front as it looks today and the guttering around the eave line. Can you see it?pklongball
June 14Here we have today's view into the master bath and the shower zone with the built in bench added for sitting down and enjoying a relaxing shower. A shower unit will be installed near this benchpklongball
June 14Opposite side of the shower zone and the cut out in the wall that will allow storage of any personal items for showeringpklongball
June 14The wood work team hard at it installing another deck railing near the master bedroom doorpklongball
June 14Underside view of the new stainless gutter installed a few days ago. Now the gutter is primed and ready for the color to match the eavespklongball
June 14One of the bath vanities granite top pklongball
June 14Tileman using grinding tool to round the edges of the granite toppklongball
June 14Another tileman is using the water cutter to cut the granite for the vanity backsplashpklongball
June 14Same man different view. This water cooled cut is done with a small tube and siphoned water from a bucketpklongball