June 7Here the tile crew is working their magic on the sand wash on the back steps. pklongball
June 7More of the crew adding the sand wash to the rear stepspklongball
June 7A different angle but the same day and more of the same sand wash stepspklongball
June 8I will not say I was reaching for the moon here just giving a perspective as to how high the ceiling is in relation to my six feet plus outstreched armpklongball
June 12Now the second bath floor is almost finished. Just some grout work to do.pklongball
June 12Another inside view of the second bath and the floor and now partially built vanity for the sink.pklongball
June 12The tile man is laying some tile at the master bedroom door . The window crew is coming o install the fram and this needs to be done todaypklongball
June 12The wall man is adding the finish to the now completed column in the backpklongball
June 12Column rendering and the partial counter and cabinet built in the back. This cabinet will house the gas bottles, storage and a shoe rack2 commentspklongball
June 12Now we have a finished set of steps in the front. I am quite pleased with this outcome. The addition of aluminum noses on the stairs is a nice safety featurepklongball
June 12The rear side steps to the balcony and the newly finished tile and aluminum noses on the stairspklongball
June 12We decided to install a rain gutter to the roof line around the read veranda. Huge amounts of rain came off this roof and down the long valley. It is stainless steel and has been painted with a primer so we can match the trim colorpklongball