27 MayThe rear veranda floor, walls, ceiling and trimpklongball
|
|
|

30 MayA long view of the team preparing to lay the sidewalk concretepklongball
|
|

30 MayThe front step area that is being prepared for the concrete walk way.pklongball
|
|

30 MayWhile the tile crew is working inside the concrete crew is busy laying the sidewalk on the side of the house to the rear steps.pklongball
|
|

30 MayAnd we can see this floor level shot of the new main floor tilepklongball
|
|

30 MayThe tile crew has now made a good start on laying the main floor tile.pklongball
|
|

30 MayHere we have a worm's eye view of the fish line that the tile man uses to get a straight line for his tile.pklongball
|
|

30 MayAnother view of the sidewalk laying process. The average thickness of this hand mixed stuff will be 8-10cm.pklongball
|
|
|
|
|
|

|
|
|