8 MayHere we have one of the boxes I popped the cover on to check Sparky's wiring and splicing and the proper use of the wire nuts I am paying for. I can say I am more than pleased at his work.pklongball
|
|

8 MayHere we have one of the boxes I popped the cover on to check Sparky's wiring and splicing and the proper use of the wire nuts I am paying for. I can say I am more than pleased at his work.pklongball
|
|

8 MayAnother view of another portion of the raceway. This is proving to be a great idea I thinkpklongball
|
|

8 MayI climbed up a tall ladder today to inspect the wiring and stuff from close up. Here is one view of the raceway now with some wire.pklongball
|
|

8 MayAnother view of the ceiling area and the complex of raceway, wires and conduitspklongball
|
|
|

8 MayA shot looking down from just above the load center and where all the wires make the turn and head down to the breakers.pklongball
|
|
|

9 May 2009Sparky and Sparky 2 have now prewired most of the house. The ceiling lights over the main entry and veranda are shown herepklongball
|
|

11 MayA more distant shot of the cabling installed for the 3 phase power and meter. The closer pole is the pole we installed for our connection. The pole opposite is the project installed pole. We had to have the cabling and pvc installed to get ready for the new meter in a month or two.pklongball
|
|

11 MayA not to close view of the newly installed cabling for the 3-phase hookup we will have in a month or two. Sparky called in the local PEA inspector to look over the house wiring and it just so happens that this guy also moonlights installing pre-meter install wiring. So now we have this covered and when the main connect is need we already have his approval so one step closer to having power.pklongball
|
|

18 MayA new view today. Sparky and helper dug the trench for the PE pipe today. More pics show the results of this.pklongball
|
|
|

|
|
|