0009_-_Laying_Out_Footers_-_100207.jpg
Laying out the pile locationsRick B
0012_-_Delivering_Piles_-_110307.JPG
Piles being deliveredRick B
0014_-_Driving_Piles_-_110307.JPG
Driving 7m long piles for the house footers. A total of 32 piles were driven for the house, which has a first floor foot print of 17.3m x 16.1m. Rick B
DSC01997_-_Locating_Footers_-_111507.JPG
Laying out the footer locations and dimensionsRick B
DSC02010_-_Assembling_Column_Rebar_Cage_-_112007.JPG
Assembling the rebar cages for the columns. Rick B
DSC02017_-_After_Concrete_Yap_in_Footer_Hole_-_112207.JPG
This is a double pile footer arrangement. A single column will come out of this hole.Rick B
DSC02019_-_After_Concrete_in_Footer_Hole_-_112207.JPG
Footer hole with single pile now ready for footer rebar cage. Pile was driven into ground about 1 meter below grade. Hole was prepared with compacted sand and cement, about 10cm thick each.Rick B
DSC02030_-_Raising_Second_Column_-_112207.JPG
Raising the ceremonial columns. Our ceremony involved two columns.Rick B
DSC02038_-_Footer_and_Column_Rebar_Cages_-_112207.JPG
A typical footer and column placed on top of a single pile.Rick B
DSC02052_-_Raising_Final_Columns_-_112307.JPG
All columns for the house are now raised.Rick B
DSC02066_-_Rebar___Forms_Lower_Foundation_-_112707.JPG
Columns have been poured from the footer up to just below the first floor elevated beams. Rebar for beam to hold wall surrounding the crawl space is also being assembled.Rick B
DSC02067_-_Lower_Block_Work_around_house_-_112907.JPG
Blocks installed on top of ground level beam to enclose the crawl spaceRick B