happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Renovations and Maintenance > View Talay 2 Condo

IMG_3251.jpg
Granite SkirtingInstalling and adjusting the position of the granite skirting on the front of the under mount sink.dozer
IMG_3306.jpg
Wood FrameThe wood is teak plywood on top of a frame made of furniture wood.dozer
IMG_3308.jpg
Installing the Wood StructureThe wood work is done offsite and then brought in and installed in pieces. The electric which feeds in will support the LED lighting. dozer
IMG_3313.jpg
Granite Counter and Wood DoorsThe under mount sink and the granite counter top works nice in this condo. The wood doors on the bottom allow for easy access to the storage space below. Notice the tile trim piece is aluminum (as opposed to plastic trim).dozer
IMG_3314.jpg
Close Up of Finished Wood WorkThere is a left shelf and framed mirror along with the top ornamental lamp station. The lighting on top is LED lights.dozer
IMG_3346.jpg
Fagor Water HeaterThis is a small Fagor Hot Water heater. The temperature adjustment is made at the shower faucet.dozer
IMG_3347.jpg
ToiletThis standard brand toilet uses an adjuster that allows the center of the toilet hole to be less than the standard 30.5 cm. dozer
IMG_3351.jpg
WoodworkThe wood work is using a thin teak plywood as a exterior finishing material attached to an internal wood frame. The wood work here is by our favorite wood worker and is really good.dozer
IMG_3382.jpg
Christina Shower EnclosureThese are measured and cut to order but are not cheap. The stainless think panel glass would not work because a sliding door is needed to conserve space. dozer
IMG_3398.jpg
WasherThe electrolux washing machine. Notice the bticino weather proof electric box and water valve.dozer
VT2AFTER.youtube
After ClipThis clip shows the finished bathroom with new cabinet wood doors, sink, granite counter, above counter woodwork, tiles, shower enclosure and plumbing work for washer. dozer
 
35 files on 3 page(s) 3

Debug Info 
Debug Output: show / hide