Home > Renovations and Maintenance > View Talay 2 Condo

IMG_3147.jpg
CeilingPlastering up the joints and screw heads in the new ceiling.dozer
IMG_3151.jpg
FlintkoteA water proof paint is applied to the sub floor to ensure that moisture can't penetrate to the condo below. dozer
IMG_3152.jpg
FlintkoteAn important step that if omitted can cause problems later on with moisture seepage to the ceiling of the lower floor. dozer
IMG_3158.jpg
Wall TilesThe wall tiles laid with the appropriate holes for the faucets. Note also the silver color aluminum trim piece that will be used for edging. dozer
IMG_3159.jpg
Installing Square D PanelInstalling the 6 station square D panel.dozer
IMG_3189.jpg
Wall TileWeber 'tile fix' tile adhesive is applied to the back of the wall tile prior to setting it in place.dozer
IMG_3200.jpg
Floor LevelThe floor is poured level in preparation of the floor tiles.dozer
IMG_3203.jpg
Trim PieceInstalling the aluminum trim piece.dozer
IMG_3215.jpg
Toilet AdjustorThe toilet adjust that allows the center of the toilet hole to be less than 30.5 cm (as in this case).dozer
IMG_3246.jpg
Granite Faucet HoleOn site drilling of the faucet hole for the granite counter.dozer
IMG_3248.jpg
Adhesive Concrete MixApplying an adhesive concrete mix to support the granite skirting.dozer
IMG_3249.jpg
SinkThe sink is left to dry after it is installed along with the granite counter top.dozer