happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Renovations and Maintenance > Kiang Talay Condo

IMG_0913.jpg
Wall ImprefectionThe painter fixing a wall imperfection. dozer
IMG_0921.jpg
Putty AppliedWall putty is applied to smooth the area where the new electric outlet is. dozer
IMG_1034.jpg
Original BathrooomThe bathroom after the new water line is attached near the toilet. The floor was partially re tiled. dozer
IMG_1038.jpg
Finished Floor SectionThe finished tile floor with skirting of the original tiles. The painting of the walls, ceiling and trim is also complete. dozer
IMG_1041.jpg
Electric Outlet w Tele JackNew electric outlet with a telephone jack.dozer
IMG_1043.jpg
Water HeaterA new Stiebel water heater was installed along with a VRH stainless shower head. dozer
KTFinishedView.youtube
Walkthrough of Finished CondoA quick walk through of the completed condo. It was re-tiled and painted in just 4 days. dozer
 
31 files on 3 page(s) 3

Debug Info 
Debug Output: show / hide