|
|
New Electric ReceptacleA new electric receptacle is established. dozer
|
|
Water LineA water line using flexi pipe is to be run under the tiles. Flexi pipe is used since there are no junctions anywhere in the pipe run.dozer
|
|
Secured Flexi PipeThe flexi pipe is run into the bathroom and is secured in place.
dozer
|
|
Starting TilingThe heavy granito tiles are laid in dry pack, electric line and water line will be under the tile. dozer
|
|
Water LineThe water line run under the tiles. The tiles are laid with 2mm spacers in this project. dozer
|
|
Applying the Slurry MixApplying the slurry adhesive mix to the underside of the tile. This then gets placed on the drypack.dozer
|
|
True LineA true line indicating where the edge of the tile should be. dozer
|
|
Leveling the TilesLeveling the tiles in place after they are laid. dozer
|
|
Grout LineThe scissors show that there is no residual concrete in the grout line (prior to grouting) when the tiles are laid in dry pack manner.dozer
|
|
Grounded ElectricA new grounded electric receptacle with a telephone jack that will be routed up through the ceiling.dozer
|
|
Grouted Tile SectionA completed and grouted section of tiles.dozer
|
|
Grouting the SkirtingGrouting the skirting and floor tiles. dozer
|
|
|
|
|
|