This shows the rough finish on the stucco and the tiles being applied. Cement unmixed with sand is used as the affixing agent. (15-May-04)dozer
This shows the opening formed for the exhaust fan. The opening is made from a wood frame cemented in place in the wall. The fan fits in place and can be slid out for cleaning. (18-May-04)dozer
The cement surface of the cabinets is rough finished to allow the tiles to affix easily. dozer