happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Original Coolthaihouse Section > Original Coolthaihouse Info > Details > Kitchen

DSC02001~0.jpg
Sample Kitchen #1: The metal for the kitchen counter is secured on top of some grc sheets and drilled into the wall prior to pouring cement. (26-Apr-04)dozer
DSC02002~0.jpg
The red bricks designate where the sink will go. dozer
DSC02008~0.jpg
Pouring cement to form the counter.dozer
DSC02009~0.jpg
The counter after the cement pour. (27-Apr-04)dozer
DSC02113~0.jpg
The counter will be supported by red brick columns. (13-May-04)dozer
DSC02116~0.jpg
Partially finished counter with supporting brick columns.dozer
DSC02133~0.jpg
Metal rebar (2 hun) is used in forming the brick column supports to add strength. A hole is drilled in the wall so the metal can be inserted.dozer
DSC02134~2.jpg
Nails are used on the outside of the cabinet to anchor to the surrounding wall. dozer
DSC02136~0.jpg
A counter section after the red brick enclosure is complete. (14-May-04)dozer
DSC02137~1.jpg
Each cabinet section has a wood door.dozer
DSC02139~0.jpg
Here stucco has been affixed.dozer
DSC02146~0.jpg
This shows a relatively think layer of stucco is applied.dozer
23 files on 2 page(s) 1

Debug Info 
Debug Output: show / hide