happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Original Coolthaihouse Section > Original Coolthaihouse Build > Details > Kitchen

DSC02001.jpg
The metal for the kitchen counter is secured on top of some grc sheeting material and drilled into the wall prior to pouring cement. (26-Apr-04)dozer
DSC02002.jpg
The red bricks designate where the sink will go. dozer
DSC02008.jpg
Pouring cement to form the counter.dozer
DSC02009.jpg
The counter after the cement pour. (27-Apr-04)dozer
DSC02113.jpg
The counter will be supported by red brick columns. (13-May-04)dozer
DSC02116.jpg
Partially finished counter with supporting brick columns.dozer
DSC02133.jpg
Metal rebar (2 hun) is used in forming the brick column supports to add strength. A hole is drilled in the wall and the metal inserted.dozer
DSC02134~0.jpg
Nails are used on the outside of the cabinet to anchor to the surrounding wall. dozer
DSC02136.jpg
A counter section after the red brick enclosure is complete. (14-May-04)dozer
DSC02137~0.jpg
Each cabinet section has a wood door. dozer
DSC02139.jpg
Here stucco has been affixed.dozer
DSC02146.jpg
This shows a relatively think layer of stucco is applied.dozer
24 files on 2 page(s) 1

Debug Info 
Debug Output: show / hide