happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Original Coolthaihouse Section > Original Coolthaihouse Build > Details > Eves

DSC01155.jpg
Building the wood framework. (24-Apr-04)dozer
DSC02036.jpg
Wood framework. (02-May-04)dozer
DSC02048.jpg
The grc sheeting is applied in sections like this. Separating the grc sheeting is a decorative wood strip. (03-May-04)dozer
DSC02054.jpg
A partially enclosed section on the back part of the house.dozer
DSC02060.jpg
A completed but unpainted section on the back part of the house. (05-May-04)dozer
DSC02075.jpg
Applying a primer coat. (08-May-04)dozer
DSC02091.jpg
The wood framework above the parking area. (11-May-04)dozer
DSC02092.jpg
A close up of the wood structure.dozer
DSC02100.jpg
The grc sheeting being laid in over the carport.dozer
DSC02106.jpg
Decorative wood trim is applied around the foundation posts. (12-May-04)dozer
DSC03023.jpg
The partially completed section over the parking spot. (21-May-04)dozer
DSC04016.jpg
Above the patio. (12-Jun-04)dozer
14 files on 2 page(s) 1

Debug Info 
Debug Output: show / hide