happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Original Coolthaihouse Section > Original Coolthaihouse Build > Details > Ceiling

DSC02017.jpg
This shot shows a sample of the support metal which is used to support the ceiling sheetrock. It is the 'U' shaped metal piece in the upper portion of the photo. (27-Apr-04)dozer
DSC02058.jpg
The metal frame is supported by attaching wire to the truss metal. (05-May-04)dozer
DSC02063.jpg
Metal supports are spaced at about 2/3 meter square.dozer
DSC02066.jpg
And it attaches to the support metal framework like this. (06-May-04)dozer
DSC02073.jpg
Checking the frame. (07-May-04)dozer
DSC02094.jpg
Installing sheetrock. (11-May-04)dozer
DSC02109~0.jpg
Sheetrock laid in place with cut outs for lighting and fans. (12-May-04)dozer
DSC03010.jpg
Electric conduit will lay on top of the metal support structure. (18-May-04)dozer
DSC03165.jpg
Taping the sheetrock seams. (07-Jun-04)dozer
DSC03168.jpg
Mixing up a bucket of taping cement.dozer
DSC04005.jpg
Ceiling after taping complete.dozer
DSC04032.jpg
This type of down lighting snaps in place and is easier to install than less expensive types. (17-Jun-04)dozer
14 files on 2 page(s) 1

Debug Info 
Debug Output: show / hide