happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Original Coolthaihouse Section > Original Coolthaihouse Build > Basics > Roof

DSC02013.jpg
Close-up of underside of roof section. dozer
DSC02018.jpg
Working on the front roof valley of the house. (28-Apr-04)dozer
DSC02019.jpg
The tile is laid over aluminium drainage sheets in the valley section. dozer
DSC02023.jpg
This shows the patch done on the inside of the roof valley but it is a little hard to see. Basically instead of one piece of aluminum an additional piece was added on top which sets on top of the 1 * 1 cross supports. The whole idea here is to add more angle and prevent any water entry during a rainy storm with high winds. (29-Apr-04)dozer
DSC02030.jpg
Front valley being completed. (30-Apr-04) dozer
DSC02031.jpg
Front valley looks pretty poor after the first try. This will need to be reworked since the tiles do not come together in a nice clean straight cut line. dozer
DSC02032.jpg
Close up of valley problem area. dozer
DSC02033.jpg
Repair work on valley in progress.dozer
DSC02046.jpg
Repaired roof valley. dozer
DSC02079.jpg
A supplemental support beam was added to the roof section over the driveway. (08-May-04)dozer
DSC02083.jpg
Plastic inserts like these come in easy to install strips, each piece covering 3 sections (like the one shown). The are used to prevent birds and rodents from entering the attic area. (09-May-04)dozer
DSC02090.jpg
Patio roof section along in foreground. (10-May-04)dozer
40 files on 4 page(s) 3

Debug Info 
Debug Output: show / hide