Home > House Construction > Chok Dee #2 > Grounds

IMG_9360.jpg
Applying the Color Render CoatThe color render coat is applied much the same as a normal render coat. In preparation however a previous coat was applied in a rough state and allowed to set for a week, which prevents the underlying block shape from bleeding through. dozer
IMG_9371.jpg
Gate RailThe rail for the gate is laid in place The rail must run level and equidistant from the wall to ensure easy opening and closing of the gate. The rail will be concreted into place. It is strip of 1.5 inch angle steel with a 12 mm round steel rod welded on top. Two sets of two large 4 inch wheels (total of 4) with an indentation will be affixed to the lower edge of the gate, the wheels are grooved to run along the rod. dozer
IMG_9381.jpg
Exterior GutterThe exterior gutter being smoothed after being poured. dozer
IMG_9466.jpg
Wall CleaningSpots from construction debris can be washed off the colored concrete using water and a pad.dozer
IMG_9668.jpg
Palms PlantedA bit of a garden on the right side of the driveway.dozer
IMG_9707.jpg
Water Flow TestThe walkway is designed to slope out. Then the external gutter area will route water down to the street. dozer
IMG_9720.jpg
Water Flow Test and Drainage PVCThe drainage PVC has been installed in the proper places to allow the water to exit the site, as evidenced during this flow test. dozer
 
19 files on 2 page(s) 2