happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction > Chok Dee #2 > Plumbing

IMG_9681.jpg
Water HeaterThis is the Siebel water heater as installed in the shower enclosure. The electric is fitted within the wall to feed to unit. Inbound water pipe is shown with an safety on/off valve at the junction with the wall. dozer
IMG_9713.jpg
Service Opening Water TankThe finished and plumbed water tank with the automatic pump on top. dozer
IMG_9728.jpg
Tank ServiceThe inside of the tank being cleaned of any debris.dozer
IMG_9769.jpg
Proper Leveling of ToiletThe toilet being check for level during installation.dozer
28 files on 3 page(s) 3

Debug Info 
Debug Output: show / hide