happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction > Cool Thai House Phase 2 > Ceiling

IMG_3612.jpg
Repair WorkThis was not easy repair work done (because of lack of access) done by the wood working group. Part of the screen cover had not be laid correctly and there was an opening with no screen protection. dozer
DSCN0439.jpg
Upper Strap ConnectionThe aluminum strap attaches to the tile batten or the roof structure. These strap type attachers are always better than wire. 1 commentsdozer
DSCN0441.jpg
Lower Strap ConnectionThe strap used to hold the ceiling frame in place. dozer
 
27 files on 3 page(s) 3

Debug Info 
Debug Output: show / hide