First Floor Concrete beams with partial removal of formwork ready for receiving the precast first floor slabs. I was very happy with the quality of the beams.chiyman
Pre Cast Concrete slabs being unloaded directly to the first floor beamschiyman
Lifting the precast ploor slabs into position on the first floor beams chiyman
Precast slabs in place forming the first floor - note the hole left is for the stairwell.chiyman
Placing the first floor pre cast slabs, removal of first floor beam formwork and placement of first floor slab mesh reinforcement.chiyman
Precast Slabs placed and formwork ready for pouring 50mm cover of concretechiyman
A hoist put in position for lifting concrete to first floor for final casting of the first floor slab on top of the precast slabs.chiyman
Placing the steel reinforing mesh on the first floor precast slabschiyman