|

|

Escorting the truckThe shop is about 15 km from the land, so we had to take them, as its quite difficult to describe the exact location.Max&Bee-in-CM
|
|

The first postUnloading the first post from the truckMax&Bee-in-CM
|
|

Posts and truckWe asked them to put 1/3 of the posts in each of 3 different locations around the land, to save carrying time.Max&Bee-in-CM
|
|

First postI was quite happy to get it straight and levelMax&Bee-in-CM
|
|
|

Hammering the stakesSome are easy to hammer into the ground, others are not.Max&Bee-in-CM
|
|
|
|

Wire tiesI found the simple frame and wire tires were much quicker to build and hold the posts than the old frame i started with, dont know why I didnt do the simple option first.Max&Bee-in-CM
|
|

Levellingthe level thing is my second favorite tool, even the Thai workers at site started using it more often.Max&Bee-in-CM
|
|

Working into the nightSo much cooler to work into the evening, but the mosquitoes start to bite at nightMax&Bee-in-CM
|
|
|
|

|
|
|