Home > User galleries > changnoi > Week 15 - Rendering Outside Inside and Electricals

cpac_tile_paint.jpg
CPAC Roof Tile PaintWow even the right colour well done PMchangnoi
driveway_from_above.jpg
Driveway from aboveThe main body of driveway will eventually get a coating of sandstone washchangnoi
noi_bedroom_from_wardrobe_area.jpg
Noi's bedroom walls nearly all finishedLooking from wardrobe end to doorchangnoi
noi_bedroom_wardrobe_area.jpg
Noi Bedroom Wardrobe Area (Bedroom 3)changnoi
soi_bedroom_wardrobe_area.jpg
Soi Bedroom Wardrobe Area (Bedroom 2)changnoi
doorways_to_both_bedrooms.jpg
Bedroom 2 & 3 doorwayschangnoi
anchor_tops_of_walls_to_roof_truss.jpg
Anchoring the walls to the truss shot 3changnoi
anchor_tops_of_walls_to_roof_truss_2.jpg
Anchoring the walls to the truss shot 2changnoi
anchor_tops_of_walls_to_roof_truss_3.jpg
Anchor Upstairs Walls to Roof TrussWelding the tops of the walls to the roof trusschangnoi
us_side_deck_looking_inside_through_doorway.jpg
Doorway for Upstairs deckchangnoi
upstairs_hallway_from_master_bedroom.jpg
At last this is what the Upstairs Hallway will look likefrom master bedroom looking to stairschangnoi
window_walls_in_master_bedroom_and_lounge.jpg
Master bedroom & Lounge Window Wallschangnoi