|


| Last additions - Ians's Gallery |

Vibrating the concrete for the first pilecap / footingIansMar 24, 2011
|
|

The bucket brigadeIansMar 24, 2011
|
|

Form work and reo'IansMar 24, 2011
|
|

The concrete handling equipmentIansMar 24, 2011
|
|

| Random files - Ians's Gallery |

just love the variety of hatsIans
|
|

The whole builing has been has been setout with "string-lines" (actually fishing line) to ensure all footings etc are in the correct location.Ians
|
|

bare-footed woman hard at work for 200 Baht per hole.Ians
|
|

A 3 D of our planned home. Influenced by Mediteranian and Aussie style houses. Veranda all round, cavity brick on all external walls, 3 metre ceilings in bedrooms etc with 4 metre in the lounge and living area's. Ians
|
|

digging for the pile capsIans
|
|

The bucket brigadeIans
|
|

Test pile being driven.Ians
|
|

Our land when purchased Oct 2008Ians
|
|

|
|
|