|
Last additions - Ians's Gallery |
Vibrating the concrete for the first pilecap / footingIansMar 24, 2011
|
|
The bucket brigadeIansMar 24, 2011
|
|
Form work and reo'IansMar 24, 2011
|
|
The concrete handling equipmentIansMar 24, 2011
|
|
Random files - Ians's Gallery |
just love the variety of hatsIans
|
|
The bucket brigadeIans
|
|
Onsite steel reo in progressIans
|
|
bare-footed woman hard at work for 200 Baht per hole.Ians
|
|
site shed on the vacant block oppositeIans
|
|
ready for pile capIans
|
|
The whole builing has been has been setout with "string-lines" (actually fishing line) to ensure all footings etc are in the correct location.Ians
|
|
Test pile being driven.Ians
|
|
|
|
|