23 March 2009The start of the electrics includes switch boxes. In this case 4 boxes near the front door to control lights in the house and on the veranda and also the car parking area. You can see the traditional method of mounting the box on a horizontal plane.pklongball
|
|

Jan.30,2010I'm holding the pressure switch that will operate the pump control. I saw no brand name or where it was made and the install booklet disappeared before I could find it. But I know it will start the pump at about 20 psi and stop it at about 55 psi.pklongball
|
|

31 MayThis is a look at the floor in the living room towards the front door. About 65 percent done here.pklongball
|
|

June 23The side walk is nearly finished with the sand wash top.pklongball
|
|

26 Feb. 2009It's been a week now since they started working on the roof steel and now we finally can see a shape. This work is some of the most difficult I've seen on my place and the sun is not relenting at all. Very hot every day and the scaffold work can't be easypklongball
|
|

18 AprilAnd from another angle you can see the Sherawood has been applied to the upper gable. I think it will look very nice when complete.pklongball
|
|
|

20 MayHere we can see the finished PE pipe that has 2 phone cables. One will be active and the second a backup pair.pklongball
|
|

|
|
|