Last additions - teevee's Gallery |
Two houses were not big enoughAdding the third house after the first two were up and we wanted more space than we had with only two housesteeveeApr 28, 2007
|
|
The roof goes onThe roof goes on, consisting of (1) a galvanized tin layer and (2) a reflective aluminum layer and (3) the tilesteeveeApr 28, 2007
|
|
But three houses looked fineWorking on the third house which was added at a late stage after the first two were upteeveeApr 28, 2007
|
|
The houses complete and time to start underneathThe houses are up & getting ready to link the three houses & to build underneath all three houses. teeveeApr 28, 2007
|
|
Random files - teevee's Gallery |
The houses complete and time to start underneathThe houses are up & getting ready to link the three houses & to build underneath all three houses. teevee
|
|
The roof goes onThe roof goes on, consisting of (1) a galvanized tin layer and (2) a reflective aluminum layer and (3) the tilesteevee
|
|
Two houses were not big enoughAdding the third house after the first two were up and we wanted more space than we had with only two housesteevee
|
|
The House - 1The house looking up from the river bankteevee
|
|
The Pool - 2The pool looking out over the infinity edge at the river.teevee
|
|
But three houses looked fineWorking on the third house which was added at a late stage after the first two were upteevee
|
|
The Pool - 1The 12 m x 4.5 m x 1.6 m infinity edge pool. We built it at 1.6 m deep all over as I did not want the complications of a shallow end / deep end with the single pour of 49m3 of concrete. We then built steps in each corner which has turned out to be great - in and out and also a good spot to sit on a hot day. teevee
|
|
|
|
|
|