We have built a new home in the country and are selling our home in Muang Phitsanulok. It is a two story fully detached home, on a 21 talong wah lot with 91 m2 living space. There are 2 bedrooms, a living/dining room, a western style kitchen with counters and cupboards, an office/den, bathroom/hot water shower, laundry room with big window for indoor drying, and a fully gated garden/patio. Windows have mosquito screens and security grates. Included are 3 air conditioners, 7 wall fans, 1 ceiling fan, rotating satellite dish, bedroom curtains and 4 window shades.
This 5 year old home has been expanded and renovated over the last 3 years to western comfort standards and is very clean and well maintained. Located in Muang Phitsanulok, ampur Plaichumpon. This quiet development/village, is less than 2 kilometers from the new Central Plaza/Tops market offering extensive dinning and shopping venues. Within 7 km of central Phitsanulok city and other major shopping including: Lotus, Index, Big C, Homepro. Just off the main hwy to Sukhothai and the North.
Chanote is free and clear and home can be available in December 2012. Asking 1,190,000 baht.
Contact: e-mail falangsabai@hotmail.com, tel: English/Marshall-081 3666959, Thai/Cat-084 7400917
PHITSANULOK HOME FOR SALE 1,190,000 BAHT
Moderators: MGV12, BKKBILL, Sometimewoodworker, tcth16
-
- Posts: 45
- Joined: Sun Nov 27, 2011 9:08 am
PHITSANULOK HOME FOR SALE 1,190,000 BAHT
- Attachments
-
- DSC_0149.JPG (39.91 KiB) Viewed 98127 times
-
- DSC_0145.JPG (13.69 KiB) Viewed 98127 times
-
- DSC_0101.JPG (18.76 KiB) Viewed 98127 times
-
- DSC_0076.JPG (15.01 KiB) Viewed 98127 times
-
- DSC_0062.JPG (15.62 KiB) Viewed 98127 times
-
- DSC_0054.JPG (15.05 KiB) Viewed 98127 times
-
- DSC_0055.JPG (15.76 KiB) Viewed 98127 times
Re: PHITSANULOK HOME FOR SALE 1,190,000 BAHT
How is the new house coming along?
-
- Posts: 45
- Joined: Sun Nov 27, 2011 9:08 am
Re: PHITSANULOK HOME FOR SALE 1,190,000 BAHT
The new house is coming along slowly but surely. Now they are laying the tile, and constructing the kitchen counters. Primer coat of paint is done, 70% of electric is done, waiting to complete PVC and waste system. We're down to a very small crew which has slowed things down but they are working very well and are easy to control. We have decided to "tahm jai" and wait it out. The first crew quit after the contractor demanded they correct some imperfections in the roof. Good riddance. All things considered It's actually going better than I had anticipated.