happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction > Cool Thai House Phase 2

Top rated - Cool Thai House Phase 2
DSCN0377.jpg
Bunk BedThis bunk bed was created from a small picture given to the welder by Ms Dozer. The pieces bolt together and it was a great use of some excess steel we had lying around. dozer00000
(0 votes)
DSCN0375.jpg
Satillite TowerThe completed satellite tower with the dish on top.dozer00000
(0 votes)
DSCN0371.jpg
Gate LatchI had given the welder some ideas for the gate latch in that I wanted something that didn't lock and could be opened and closed easily with one hand. He came up with this him self using extra lengths of the security metal. dozer00000
(0 votes)
DSCN0369.jpg
Security MetalThe hand fabricated security metal. This was made from prefab pieces of metal. He welded them in sections and then installed them on top of the wall. dozer00000
(0 votes)
IMG_2365.jpg
Security MetalThe hand fabricated security metal. dozer00000
(0 votes)
DSCN0448.jpg
Undermount Ceramic SinkAn undermount ceramic sink. The granite is cut at the factory using the actual sink as a guide.dozer00000
(0 votes)
DSCN0445.jpg
Undermount Stainless SinkAn undermount stainless sink.dozer00000
(0 votes)
DSCN0419.jpg
Finished EdgeThe finished and grouted edge/corner of the granite counter top. dozer00000
(0 votes)
IMG_2508.jpg
Undermount Sink Held in PlaceThe under mount sinks are secured in place after the granite is set and left to dry. dozer00000
(0 votes)
Photo-0021.jpg
Desks Ready for Granite TopThe desks as built by the wood man (same one that did the wood trim painting and installation) as they sit ready for installation of the granite tops. dozer00000
(0 votes)
IMG_2950.jpg
Desk FittingThe installer adjusting the cut and edged granite to have the same overhang on all sides. dozer00000
(0 votes)
IMG_2948.jpg
DeskOne desk with the granite top installed, the other ready to go. dozer00000
(0 votes)
437 files on 37 page(s) 9

Debug Info 
Debug Output: show / hide