happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction > Cool Thai House Phase 2

Top rated - Cool Thai House Phase 2
IMG_2846.jpg
Storage CabinetThe frame of the cabinet prior to attaching the wood shelving and latches. dozer00000
(0 votes)
IMG_2810.jpg
Working on a GateFabricating one panel for a gate. dozer00000
(0 votes)
IMG_2597~0.jpg
Security MetalWelding security metal in place. dozer00000
(0 votes)
IMG_2593.jpg
Coming up with Curved PieceThe curved pieces of security metal are purchased already curved. Here the welder is curving a piece (from a straight one) since we had run out of the curved ones.dozer00000
(0 votes)
IMG_2549.jpg
Working on Metal CabinetThe metal cabinet in the process of being welded - not sure what the hammer is for. dozer00000
(0 votes)
IMG_2535.jpg
CabinetOne cabinet at the beginning. We had him do several of these, used for storage. dozer00000
(0 votes)
IMG_2443.jpg
SpacerA spacer tool to ensure the vertical metal bars are straight. dozer00000
(0 votes)
IMG_2317.jpg
Barbed Wire SupportThis shows a support for barbed wire which utilizes tensioners that fit into the support. dozer00000
(0 votes)
IMG_2274.jpg
Satillite StandThis is the satellite stand used to support the 6' dish. dozer00000
(0 votes)
IMG_2247.jpg
Partially Welded LadderA partially welded ladder that will be anchor bolt mounted on the wall to allow attic access through the service entry. dozer00000
(0 votes)
DSCN0382.jpg
BedA single bed as fabricated by the welder. The side rails can be unbolted and it can be disassembled as required. dozer00000
(0 votes)
DSCN0380.jpg
Service LadderThe service ladder as mounted to the wall. dozer00000
(0 votes)
437 files on 37 page(s) 8

Debug Info 
Debug Output: show / hide