happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction > Cool Thai House Phase 2

Top rated - Cool Thai House Phase 2
IMG_2682.jpg
Air GunThe air gun is used to nail the trim wood into place. dozer00000
(0 votes)
IMG_2677.jpg
Trim WoodA piece of trim wood for the outside edges of the ceiling. Note that glue is applied prior to applying the piece to the ceiling where it is nailed in place. dozer00000
(0 votes)
IMG_2675.jpg
Trim WoodBeing nailed into place.dozer00000
(0 votes)
IMG_2674.jpg
Wood Trim AreasAnother view of wood trim areas above the kitchen and study.dozer00000
(0 votes)
IMG_2671.jpg
Trim WoodTrim wood applied around an exposed column. dozer00000
(0 votes)
IMG_2670.jpg
Wood TrimWood trim is used on the outside edge and well as the corner of the step. dozer00000
(0 votes)
IMG_2663.jpg
Wood Trim Nailed to CeilingThe wood trim pieces are nailed to the ceiling using a power gun. dozer00000
(0 votes)
IMG_2661.jpg
Wood Trim CutsAngle cutting the wood trim on a miter saw. Joints on two adjoining pieces are done at a 45 degree angle.dozer00000
(0 votes)
DSCN0433.jpg
Control UnitThis avtech control unit has a 2 TB hd and allows for remote access/viewing of the camera's via the LAN or internet.dozer00000
(0 votes)
IMG_3436.jpg
Hooking Up a LAN Connection PointThe original cctv installation crew works on getting a LAN connection point working. It took them a while but they finally got it going. dozer00000
(0 votes)
20110701111836_Live1.jpg
Distance view Speed domeThe regular non zoomed view from the avetech speed dome.dozer00000
(0 votes)
20110701111824_Live1.jpg
20 x zoomA snapshot of 20 to 1 zoom of the avetech speed dome.dozer00000
(0 votes)
437 files on 37 page(s) 4

Debug Info 
Debug Output: show / hide