|
![](images/spacer.gif)
Top rated - Cool Thai House Phase 2 |
![Filename=IMG_1693.jpg
Filesize=331KiB
Dimensions=1280x960
Date added=Sep 26, 2011 IMG_1693.jpg](albums/userpics/10002/thumb_IMG_1693.jpg)
Setting Up the PumpBefore getting too far the pump needs to be set up for so the inbound lines can be pressure tested. Any problems can be checked/fixed before concrete is poured over any piping. dozer![0](themes/rainy_dayDozer/images/rate_empty.png) ![0](themes/rainy_dayDozer/images/rate_empty.png) ![0](themes/rainy_dayDozer/images/rate_empty.png) ![0](themes/rainy_dayDozer/images/rate_empty.png) ![0](themes/rainy_dayDozer/images/rate_empty.png) (0 votes)
|
|
![Filename=IMG_1556.jpg
Filesize=464KiB
Dimensions=1280x960
Date added=Sep 26, 2011 IMG_1556.jpg](albums/userpics/10002/thumb_IMG_1556.jpg)
Drain Pipes / Inbound WaterAll of the PVC piping is wired into place prior to setting in concrete to prevent it from angling during the pour. dozer![0](themes/rainy_dayDozer/images/rate_empty.png) ![0](themes/rainy_dayDozer/images/rate_empty.png) ![0](themes/rainy_dayDozer/images/rate_empty.png) ![0](themes/rainy_dayDozer/images/rate_empty.png) ![0](themes/rainy_dayDozer/images/rate_empty.png) (0 votes)
|
|
![Filename=IMG_1531.jpg
Filesize=437KiB
Dimensions=1280x960
Date added=Sep 26, 2011 IMG_1531.jpg](albums/userpics/10002/thumb_IMG_1531.jpg)
PVC Pipe LidsAll PVC piping is covered to prevent concrete or other blockage from getting in it. Also the covers allow the inbound lines to be pressure tested. dozer![0](themes/rainy_dayDozer/images/rate_empty.png) ![0](themes/rainy_dayDozer/images/rate_empty.png) ![0](themes/rainy_dayDozer/images/rate_empty.png) ![0](themes/rainy_dayDozer/images/rate_empty.png) ![0](themes/rainy_dayDozer/images/rate_empty.png) (0 votes)
|
|
![Filename=IMG_1520.jpg
Filesize=503KiB
Dimensions=1280x960
Date added=Sep 26, 2011 IMG_1520.jpg](albums/userpics/10002/thumb_IMG_1520.jpg)
Shower Enclosure BeamA ground beam is set up to be poured where the shower enclosure will go. dozer![0](themes/rainy_dayDozer/images/rate_empty.png) ![0](themes/rainy_dayDozer/images/rate_empty.png) ![0](themes/rainy_dayDozer/images/rate_empty.png) ![0](themes/rainy_dayDozer/images/rate_empty.png) ![0](themes/rainy_dayDozer/images/rate_empty.png) (0 votes)
|
|
![Filename=IMG_1516.jpg
Filesize=521KiB
Dimensions=1280x960
Date added=Sep 26, 2011 IMG_1516.jpg](albums/userpics/10002/thumb_IMG_1516.jpg)
1 and 1/2 bathroomsThe view of the beam setup for 1 and 1/2 bathrooms. dozer![0](themes/rainy_dayDozer/images/rate_empty.png) ![0](themes/rainy_dayDozer/images/rate_empty.png) ![0](themes/rainy_dayDozer/images/rate_empty.png) ![0](themes/rainy_dayDozer/images/rate_empty.png) ![0](themes/rainy_dayDozer/images/rate_empty.png) (0 votes)
|
|
![Filename=IMG_1513.jpg
Filesize=508KiB
Dimensions=1280x960
Date added=Sep 26, 2011 IMG_1513.jpg](albums/userpics/10002/thumb_IMG_1513.jpg)
Leveling the Toilet PipeAny of the piping which doesn't come up vertical straight causes problems with fittings and attachments. The pvc is leveled and will be secured in place prior to the pour of concrete.dozer![0](themes/rainy_dayDozer/images/rate_empty.png) ![0](themes/rainy_dayDozer/images/rate_empty.png) ![0](themes/rainy_dayDozer/images/rate_empty.png) ![0](themes/rainy_dayDozer/images/rate_empty.png) ![0](themes/rainy_dayDozer/images/rate_empty.png) (0 votes)
|
|
![Filename=IMG_1506.jpg
Filesize=476KiB
Dimensions=1280x960
Date added=Sep 26, 2011 IMG_1506.jpg](albums/userpics/10002/thumb_IMG_1506.jpg)
Partially Dug SepticThe seepage tanks here will be 1.2 m wide cement rounds with an exterior of stone aggregate. dozer![0](themes/rainy_dayDozer/images/rate_empty.png) ![0](themes/rainy_dayDozer/images/rate_empty.png) ![0](themes/rainy_dayDozer/images/rate_empty.png) ![0](themes/rainy_dayDozer/images/rate_empty.png) ![0](themes/rainy_dayDozer/images/rate_empty.png) (0 votes)
|
|
![Filename=IMG_1505.jpg
Filesize=390KiB
Dimensions=1280x960
Date added=Sep 26, 2011 IMG_1505.jpg](albums/userpics/10002/thumb_IMG_1505.jpg)
Inbound Water TestDuring the inbound water pressure test the only place one should see any moisture is at the lids if they haven't be glued in place. dozer![0](themes/rainy_dayDozer/images/rate_empty.png) ![0](themes/rainy_dayDozer/images/rate_empty.png) ![0](themes/rainy_dayDozer/images/rate_empty.png) ![0](themes/rainy_dayDozer/images/rate_empty.png) ![0](themes/rainy_dayDozer/images/rate_empty.png) (0 votes)
|
|
![Filename=IMG_1495.jpg
Filesize=551KiB
Dimensions=1280x960
Date added=Sep 26, 2011 IMG_1495.jpg](albums/userpics/10002/thumb_IMG_1495.jpg)
Drain Water TestThe other end of the drain pipe is capped and tested for all drain pipes prior to pouring of any concrete. dozer![0](themes/rainy_dayDozer/images/rate_empty.png) ![0](themes/rainy_dayDozer/images/rate_empty.png) ![0](themes/rainy_dayDozer/images/rate_empty.png) ![0](themes/rainy_dayDozer/images/rate_empty.png) ![0](themes/rainy_dayDozer/images/rate_empty.png) (0 votes)
|
|
![Filename=IMG_1492.jpg
Filesize=432KiB
Dimensions=1280x960
Date added=Sep 26, 2011 IMG_1492.jpg](albums/userpics/10002/thumb_IMG_1492.jpg)
Setting Toilet DrainSetting the toilet at the correct distance per the plan. dozer![0](themes/rainy_dayDozer/images/rate_empty.png) ![0](themes/rainy_dayDozer/images/rate_empty.png) ![0](themes/rainy_dayDozer/images/rate_empty.png) ![0](themes/rainy_dayDozer/images/rate_empty.png) ![0](themes/rainy_dayDozer/images/rate_empty.png) (0 votes)
|
|
![Filename=IMG_1491.jpg
Filesize=456KiB
Dimensions=1280x960
Date added=Sep 26, 2011 IMG_1491.jpg](albums/userpics/10002/thumb_IMG_1491.jpg)
Toilet Drain with Vent OpeningThe elbow has the all important vent opening which will be vented up through the roof and prevent sluggish toilet syndrome. dozer![0](themes/rainy_dayDozer/images/rate_empty.png) ![0](themes/rainy_dayDozer/images/rate_empty.png) ![0](themes/rainy_dayDozer/images/rate_empty.png) ![0](themes/rainy_dayDozer/images/rate_empty.png) ![0](themes/rainy_dayDozer/images/rate_empty.png) (0 votes)
|
|
![Filename=IMG_1488.jpg
Filesize=577KiB
Dimensions=1280x960
Date added=Sep 26, 2011 IMG_1488.jpg](albums/userpics/10002/thumb_IMG_1488.jpg)
Various PVC PipesShowing inbound water piping, a sink drain and vented toilet drain.dozer![0](themes/rainy_dayDozer/images/rate_empty.png) ![0](themes/rainy_dayDozer/images/rate_empty.png) ![0](themes/rainy_dayDozer/images/rate_empty.png) ![0](themes/rainy_dayDozer/images/rate_empty.png) ![0](themes/rainy_dayDozer/images/rate_empty.png) (0 votes)
|
|
437 files on 37 page(s) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
26 | ![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
|
![](images/spacer.gif)
|
|
|