Vented Roof TileThe vented roof tile with plastic covering. The top will be cut for the stainless vents to go through and silicone sealed. dozer00000
(0 votes)
IMG_2006.jpg
Vent PipeThe 6 hun vent pipes to be extended up and routed through the specialty roof tiles which have an opening and plastic sleeve. dozer00000
(0 votes)
IMG_1983.jpg
Wall ShotThe walls are grooved for the vent pipes which will extend out through the roof. dozer00000
(0 votes)
IMG_1934.jpg
Vent PipesVend pipes extending upwards, eventually routed through the roof tiles. Venting into the attic space is not a good move as it creates a possible odor problem. dozer00000
(0 votes)
IMG_1897.jpg
Recessed Shower FlooringThe shower flooring is recessed to create a step down into the shower enclosure. dozer00000
(0 votes)
IMG_1896.jpg
Cementing the Shower FloorLaying concrete in the shower floor area. Notice the rebar mesh in the other shower floor area. dozer00000
(0 votes)
IMG_1881.jpg
Rough Bathroom LayoutsThe drain pipes for the floor drains are 3 inch, toilets are 4 inch, sinks are 1.5 inch. The purpose of the internal formwork is to later pour the shower floors since they will be a lower level. dozer00000
(0 votes)
IMG_1879.jpg
Bathroom LayoutBathroom nearing readiness to have the floors poured. The main floor will be poured first and then later the shower floors will be poured as they are at a lower level. dozer00000
(0 votes)
IMG_1875.jpg
Septic CoversScraping the bronze septic lids after the concrete walkway pour. dozer00000
(0 votes)
IMG_1858.jpg
6" Septic PVC Access and LidThe 6" Septic PVC access lid is covered in preparation for the walkway pour. Note the 6 hun vent pipe extending from the septic. It will be vented up through the wall and roof with the other vent pipes from the project. dozer00000
(0 votes)
IMG_1833.jpg
Preliminary Layout of Septic AccessAfter this we vented the septics and change the access lids to the 6" heavy duty type. dozer00000
(0 votes)
IMG_1729.jpg
Rough Plumbing LayoutAll of the inbound water pipes (1/2") and drain pipes ready for water pressure test. dozer00000