Fixing Roof LevelWelding in a small riser to correct the roof level. dozer (0 votes)
Batten Close UpThe roof battens are screwed into the roof structure using special roofing screws (threaded with head of screw formed as drill bit to enable the screws to penetrate the metal with no pilot hole necessary).dozer (0 votes)
Batten MaterialA close up of the batten material used to hold the ceramic tiles in place.dozer (0 votes)
Batten Material InstalledThe prefab aluminum alloy batten pieces installed over the roof structure.dozer (0 votes)
Gable CoveringThe thinner shera brand fascia covering was used for the gables. dozer (0 votes)
Double Box SectionsThe exterior of the roof structure was done with double box sections of 3.2mm 2x4.dozer (0 votes)
FasciaThis project used the heavier conwood (6" and 8") as fascia. This seems to work better than the thinner Shera fascia as the conwood doesn't warp over time.dozer (0 votes)
Gable VentThe gable vent is installed. dozer (0 votes)
Cutting the RaftersA guide line is used to ensure the rafters are cut at the proper point. dozer (0 votes)
Post to be Topped OffThis short post will be topped off with lanko 701 grout so the metal roof structure is sitting on concrete.dozer (0 votes)
CPAC Roof Tile EngineerThe tiling engineer from the company to do the roof tiling measuring and checking the roof structure so far. As they only lay down the tiles they must check that the roof structure is straight and able to hold the tile load. dozer (0 votes)
Attic WalkwayThis allows for easier access to the attic area. Created from two parallel steel tubing beams with C section rib supports and 20mm grade A plywood as the walkway. dozer (0 votes)