Home > House Construction > Cool Thai House Phase 2

Top rated - Cool Thai House Phase 2
IMG_2297.jpg
Bird GuardThe bird guard is installed on the inside of the fascia board.dozer00000
(0 votes)
IMG_2176.jpg
Finished Roof TilesOne finished section of the roofing. Notice that the ridge tiles have not been affixed with any concrete per the dry tech method. dozer00000
(0 votes)
IMG_2175.jpg
Dry Tech at the Ridge CornerThe final layer of dry tech material being laid in place at the ridge corner. dozer00000
(0 votes)
IMG_2174.jpg
Dry Tech at the RidgeThe dry tech along the ridge. There are two levels of material which sit on an aluminum rail. dozer00000
(0 votes)
IMG_2173.jpg
Dry Teching the RidgeThe first layer of dry tech material is fitted on an aluminum rail on the ridge line by the dry tech installer. dozer00000
(0 votes)
IMG_2169.jpg
Dry TechThe two layers of dry tech materials being set in place by the installer. dozer00000
(0 votes)
IMG_2135.jpg
Prefab Valley MaterialThis is the chang prefabricated valley material as installed in a roof valley (shown from the inside). dozer00000
(0 votes)
IMG_2134.jpg
Angle Cutting TilesTiles are angle cut to fit into one of the the roof valleys . dozer00000
(0 votes)
IMG_2132.jpg
Lifting Tiles into PlaceThe tile guys are lifting the tiles into place and setting them on the battens. dozer00000
(0 votes)
IMG_2121.jpg
Plastic SheetingPlastic sheeting is laid down no top of the 20 mm plywood walkway to protect it from rain.dozer00000
(0 votes)
IMG_2116.jpg
Interior of Roof StructureA shot of the interior of the roof structure with the tile battens in place.dozer00000
(0 votes)
IMG_2110.jpg
Fixing Roof LevelAny areas of the roof that are 'slightly out of shape' as declared by the roofing engineer must be rectified by welding in a 1 by 1 inch riser to correct the level of the roof batten.dozer00000
(0 votes)