DSCN0354.jpg
Aluminum TrimOn the driveway we used aluminum trim edging.dozer00000
(0 votes)
DSCN0352.jpg
Bezen Tiles PatioThe patio tiles have held up well so far. dozer00000
(0 votes)
DSCN0350.jpg
Bezen Tiles DrivewayThe driveway tiles.dozer00000
(0 votes)
IMG_2686.jpg
Tile Spacer GuideA tile is used as a spacer guide to ensure the proper distance between tiles.dozer00000
(0 votes)
IMG_2913.jpg
Scrubbing the TilesThe tiles are scrubbed with an acid mix to remove any cement residue. Later they will be treated with a silicone protectant. dozer00000
(0 votes)
IMG_2821.jpg
Setting an EdgeA edge is placed on the step up into one of the storage rooms.dozer00000
(0 votes)
IMG_2819.jpg
Grouting the SurfaceA cement mix is applied over the top of the tiles and then sponged off to set the grout in place.dozer00000
(0 votes)
IMG_2817.jpg
Setting Tiles into Weber AdhesiveHere the adhesive material was laid down first and the tiles were set into it. dozer00000
(0 votes)
IMG_2815.jpg
More Tiles in PlaceThe outside rows are the guide and red guide lines are used to indicate where each pattern will go. dozer00000
(0 votes)
IMG_2798.jpg
PatternGetting the pattern right requires the right tiler -- luckily we had the right guy (and gal) for the job.dozer00000
(0 votes)
IMG_2780.jpg
Drive Way Extra RebarExtra rebar is used in the driveway. One layer of rebar is already there, the tiler will add a second layer which sits in another 5 cm of concrete as he prepares the surface for tiling.dozer00000
(0 votes)
IMG_2721.jpg
Finished SurfaceThe finished surface prior to acid scrub to remove some signs of cement discoloration. dozer00000
(0 votes)