happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction > Cool Thai House Phase 2

Top rated - Cool Thai House Phase 2
IMG_1993.jpg
Prepping Door FrameNails are used on the exterior of the frame. Rebar extends out of the aerated block. A vertical beam will be poured on either side of the door.dozer00000
(0 votes)
IMG_1992.jpg
Nail PreppingNails on the frame as well as a 9mm piece of rebar which will be in the vertical beam. dozer00000
(0 votes)
IMG_2813.jpg
Installing Shelving UnitThe shelving units are installed with anchor bolts to the inside of the concrete structure. dozer00000
(0 votes)
IMG_2796.jpg
Mounting the Upper CabinetsStarting to Mount the Upper Cabinetsdozer00000
(0 votes)
IMG_2791.jpg
Hardware to Support Upper CabinetsThe wall mounting to support the upper cabinets. The electric is for above and below florescent lighting.dozer00000
(0 votes)
IMG_2393.jpg
Shelving UnitThis opening is designed for another shelving unit (Kitchzo). dozer00000
(0 votes)
IMG_2381.jpg
Tiling CompleteThe tiling and grouting of the cabinets are complete. dozer00000
(0 votes)
IMG_2376.jpg
Tiling on the InsideTiling on the inside of the cabinets.dozer00000
(0 votes)
IMG_2363.jpg
Tiled Table LegThe tiled and edged table leg prior to it being grouted.dozer00000
(0 votes)
IMG_2362.jpg
Tiled InsertThis opening is designed to accomodate a Kitzcho brand shelving insert. dozer00000
(0 votes)
IMG_2353.jpg
Tiling the Cabinet InteriorIn this case we used small white 4" tiles for the exterior and interior of the cabinets.dozer00000
(0 votes)
IMG_2342.jpg
Dryed StructureThe dried structure after the forms have been removed. dozer00000
(0 votes)
437 files on 37 page(s) 15

Debug Info 
Debug Output: show / hide