Prepping Door FrameNails are used on the exterior of the frame. Rebar extends out of the aerated block. A vertical beam will be poured on either side of the door.dozer (0 votes)
Nail PreppingNails on the frame as well as a 9mm piece of rebar which will be in the vertical beam. dozer (0 votes)
Installing Shelving UnitThe shelving units are installed with anchor bolts to the inside of the concrete structure. dozer (0 votes)
Mounting the Upper CabinetsStarting to Mount the Upper Cabinetsdozer (0 votes)
Hardware to Support Upper CabinetsThe wall mounting to support the upper cabinets. The electric is for above and below florescent lighting.dozer (0 votes)
Shelving UnitThis opening is designed for another shelving unit (Kitchzo). dozer (0 votes)
Tiling CompleteThe tiling and grouting of the cabinets are complete. dozer (0 votes)
Tiling on the InsideTiling on the inside of the cabinets.dozer (0 votes)
Tiled Table LegThe tiled and edged table leg prior to it being grouted.dozer (0 votes)
Tiled InsertThis opening is designed to accomodate a Kitzcho brand shelving insert. dozer (0 votes)
Tiling the Cabinet InteriorIn this case we used small white 4" tiles for the exterior and interior of the cabinets.dozer (0 votes)
Dryed StructureThe dried structure after the forms have been removed. dozer (0 votes)