happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction > Cool Thai House Phase 2

Top rated - Cool Thai House Phase 2
IMG_3541.jpg
Side Door FitThe doors fit nicely in the frames.dozer00000
(0 votes)
IMG_3540.jpg
Adjusting the OpeningHere the door opening is being adjusted. dozer00000
(0 votes)
IMG_2759.jpg
Door PaintingOil based paint (TOA Glipton) applied to louvered solid hardwood bathroom door. dozer00000
(0 votes)
IMG_2705.jpg
Window FrameA view of the window frame. There are two tracks, one for the screen and one for the window.dozer00000
(0 votes)
IMG_2703.jpg
Door HingeAttaching the door hinges to a sold wood door. 4 hinges are used to prevent any sagging. dozer00000
(0 votes)
IMG_2701.jpg
Aluminum Window FrameAttaching the aluminum window frame to the sill. dozer00000
(0 votes)
IMG_2698.jpg
Squaring Window OpeningThe window installer shapes the opening if it is not exactly square. dozer00000
(0 votes)
IMG_2052.jpg
Door FrameingThe door frame is secured in place. Column supports are poured on the side of each door frame. dozer00000
(0 votes)
IMG_2032.jpg
Glass BlocksGlass blocks laid above a ring beam with spacers in place. dozer00000
(0 votes)
IMG_2003~0.jpg
LintelThe form work for a lintel above a door opening. dozer00000
(0 votes)
IMG_2000.jpg
Side BeamU shaped pieces of rebar are used to keep the form work from bulging during the pour of the side column support for the door.dozer00000
(0 votes)
IMG_1997.jpg
FormworkAnother view of the form work in place to secure the door frame to the adjacent walls. dozer00000
(0 votes)
437 files on 37 page(s) 14

Debug Info 
Debug Output: show / hide