happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction > Cool Thai House Phase 2

Top rated - Cool Thai House Phase 2
IMG_2748.jpg
Lower Section TiledPreparing for placing the mural, the lower section has been tiled and next the sandstone engraving will be lifted into place.dozer00000
(0 votes)
IMG_2743.jpg
Engraving FrameThe prepared frame for where the 75 kg. engraving will be placed.dozer00000
(0 votes)
IMG_2741.jpg
Preparing Engraving FrameThe wall was indented in order to have a frame to support the large sandstone engraving. dozer00000
(0 votes)
IMG_2740.jpg
Large Melann Sandstone EngravingThese come in either 1 pc (as this one) or 3 pcs. We chose the single piece which weighs 75kg. dozer00000
(0 votes)
IMG_2720.jpg
Decorative Standstone CarvingsThe small decorative sandstone 30 cm tiles (each under 200 baht) were placed in various locations on the wall. dozer00000
(0 votes)
IMG_2718.jpg
Affixing Sandtone TilesThe sandstone tiles are fitted up near the wood trim. dozer00000
(0 votes)
IMG_2715.jpg
Rendered SurfaceThe rendered surface with a pencil line where the sandstone engraving will be placed. The surface was rendered by the tiler to ensure true surfaces.dozer00000
(0 votes)
DSCN0470.jpg
Lower StepThe lower step and transition to tile. One length of steel tubing is above ground and one is half under the tile level.dozer00000
(0 votes)
DSCN0471.jpg
Upper TransitionThe upper length of structural steel tubing is used as a transition into the ceiling. dozer00000
(0 votes)
IMG_2566.jpg
Finished Secured Metal PartitionThe completed metal partition with door. dozer00000
(0 votes)
IMG_2528.jpg
Rear WindowThe secured rear opening. dozer00000
(0 votes)
IMG_2179.jpg
Attaching the Guide BarAttaching the guide bar to be used in fitting in the last row of cross members. dozer00000
(0 votes)
437 files on 37 page(s) 12

Debug Info 
Debug Output: show / hide