Lower Section TiledPreparing for placing the mural, the lower section has been tiled and next the sandstone engraving will be lifted into place.dozer (0 votes)
|
|
Engraving FrameThe prepared frame for where the 75 kg. engraving will be placed.dozer (0 votes)
|
|
Preparing Engraving FrameThe wall was indented in order to have a frame to support the large sandstone engraving. dozer (0 votes)
|
|
Large Melann Sandstone EngravingThese come in either 1 pc (as this one) or 3 pcs. We chose the single piece which weighs 75kg. dozer (0 votes)
|
|
Decorative Standstone CarvingsThe small decorative sandstone 30 cm tiles (each under 200 baht) were placed in various locations on the wall. dozer (0 votes)
|
|
Affixing Sandtone TilesThe sandstone tiles are fitted up near the wood trim. dozer (0 votes)
|
|
Rendered SurfaceThe rendered surface with a pencil line where the sandstone engraving will be placed. The surface was rendered by the tiler to ensure true surfaces.dozer (0 votes)
|
|
Lower StepThe lower step and transition to tile. One length of steel tubing is above ground and one is half under the tile level.dozer (0 votes)
|
|
Upper TransitionThe upper length of structural steel tubing is used as a transition into the ceiling. dozer (0 votes)
|
|
Finished Secured Metal PartitionThe completed metal partition with door. dozer (0 votes)
|
|
Rear WindowThe secured rear opening. dozer (0 votes)
|
|
Attaching the Guide BarAttaching the guide bar to be used in fitting in the last row of cross members. dozer (0 votes)
|
|