happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction > Cool Thai House Phase 2

Top rated - Cool Thai House Phase 2
IMG_2947.jpg
Silicone AdhesiveUsing sony brand silicone adhesive to glue the granite top to the desk. dozer00000
(0 votes)
IMG_2945.jpg
Applying AdhesiveThe granite installer is laying down the silicone adhesive.dozer00000
(0 votes)
IMG_2943.jpg
Adjusting the Counter TopThe countertop being adjusted. dozer00000
(0 votes)
IMG_2506.jpg
Faucet Holed On-SiteEdging and under mount sink holes are done in the factory, everything else is done on-site. Here the hole for the sink faucet is being drilled.dozer00000
(0 votes)
IMG_2505.jpg
Faucet Hole DrillingWater is applied to keep the bit from getting too hot. dozer00000
(0 votes)
IMG_2495.jpg
Final Adjustment Stove Top AreaFinal adjustment on the area where the stove top will fit in. dozer00000
(0 votes)
IMG_2494.jpg
Sink OpeningThe sink opening for an undermount sink is always cut at the factory, the stove opening will be cut on-site.dozer00000
(0 votes)
IMG_2492.jpg
Granite Top SetTwo of the granite top pieces are set in place to check the fit. The stove top opening will be cut on-site. dozer00000
(0 votes)
IMG_2491.jpg
Final CracksAny slight openings are grouted by the installers.dozer00000
(0 votes)
IMG_2490.jpg
Concrete SlurryThe mix used to concrete the granite counter top to the base.dozer00000
(0 votes)
IMG_2489.jpg
Setting Bathroom Top in PlaceSetting the bathroom granite into place. dozer00000
(0 votes)
IMG_2751.jpg
Corner FinishShows a thick wall with a door frame being cornered with the small sandstone tiles. Notice the guide line in the corner and that the small tiles are cut at a 45 degree angle to make the corner transition. dozer00000
(0 votes)
437 files on 37 page(s) 10

Debug Info 
Debug Output: show / hide