happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction > Cool Thai House Phase 2

Top rated - Cool Thai House Phase 2
DSCN0439.jpg
Upper Strap ConnectionThe aluminum strap attaches to the tile batten or the roof structure. These strap type attachers are always better than wire. 1 commentsdozer55555
(1 votes)
IMG_3420.jpg
Edge Tiles ReplacedThe edge tiles are replaced here without excess space between the tile edge and the fascia board. 2 commentsdozer55555
(1 votes)
DSCN0465.jpg
Junction BoxA junction box in the attic. The connections are done with wire nut connectors and no tape.dozer55555
(1 votes)
IMG_1995.jpg
Wood in RaftersHard wood is fitted in the end of the rafters to be used as a surface to install the fascia board. dozer44444
(1 votes)
CTHP2FinishedView.youtube
Video WalkthroughA quick video walk though of the project a while after completion. dozer00000
(0 votes)
DSCN0415.jpg
Side Walkway and GardenThe 2m wide side walkway and garden area with 3 small tower type garden lights.dozer00000
(0 votes)
IMG_0164.jpg
StudySmall sandstone tiles are used on the wall area of the study.dozer00000
(0 votes)
DSCN0493.jpg
Storage Unit InsideAnother view of the storage/utility room with metal racks currently used for storage. dozer00000
(0 votes)
DSCN0492.jpg
Ladder and AccessThe service entry access is on the ceiling with the wall mounted ladder providing access. The glass blocks are the oversized 30 cm x 30 cm variety. dozer00000
(0 votes)
DSCN0491.jpg
Secured StorageThe security partition to make a secured storage area. The partition is made of 1 by 1 lengths of metal welded into a mesh pattern.dozer00000
(0 votes)
DSCN0490.jpg
Secured StorageA utility/secured storage room with a bunk bed in it. The roll up doors in this unit are split with a small and large section. dozer00000
(0 votes)
DSCN0489.jpg
Bathroom #2There is a small granite sink unit in each bathroom. The sink is an under mount type.dozer00000
(0 votes)
437 files on 37 page(s) 1

Debug Info 
Debug Output: show / hide