|

Top rated - House Construction |

Deep Water Pump AssemblyPreparing the Franklin deep water pump to be submerged. dozer     (0 votes)
|
|

A Melted PVC JointThe PVC joints for the piping that brings the water up from the pump are melted into place. dozer     (0 votes)
|
|

Gas Melting StationHere is the rig they used to melt the PVC piping in place. dozer     (0 votes)
|
|

Franklin PumpA view of the pump without the exterior housing. dozer     (0 votes)
|
|

Drill Rig Set UpThe rig used to drill the hole with the shaft harness upright and in position. dozer     (0 votes)
|
|

Drill Rig with Drilling ShaftsThe drilling rig. The shafts in the foreground are for drilling and attach to the trucks drill harness. dozer     (0 votes)
|
|

Well Rig Gets to LandJust enough clearance to get into the land. This is a utility gate not used as a regular entrance, as it allows entry from someone else's land (currently unoccupied). Was slated for removal, glad we kept it.dozer     (0 votes)
|
|
|
943 files on 79 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
 |
79 |
|

|
|
|