|
Top rated - House Construction |
Beam and Column IntersectionThe beam and column are contiguous rebar that will be concreted in place. dozer (0 votes)
|
|
Ground BeamThe rebar framework for the ground beam. The beams were 40 cm by 20 cm wide. The beams will sit on top of the existing soil level and the floor will sit on top of the beams. dozer (0 votes)
|
|
Support ColumnThe part of the column above the footing and below the ground.dozer (0 votes)
|
|
Poured Support ColumnA poured support column (the part of the column under the floor). The guide lines are visible which indicate where the middle of each column should be. dozer (0 votes)
|
|
Column FormworkThe formwork for the support column on top of the footing is done using cinder blocks which will stay in place after the pour. dozer (0 votes)
|
|
Column Framework set in PlaceThe column frameworks are held upright by using pieces of 1 x 3" timber. dozer (0 votes)
|
|
FootingFinishing off the top of one particular footing, height of 35 cm. dozer (0 votes)
|
|
Footing and Column FrameworkThe footing frame and the column framework in place. Spacers are at the bottom and side. dozer (0 votes)
|
|
House RaisingHere is the house raising do hicky that will be used during the celebration to raise the first post. The bag of 1000 baht notes is for show only although we did throw quite a few coins in the post holes.dozer (0 votes)
|
|
Footing FrameThe footing frame in place with 5 cm. spacers on the bottom and the upright rebar indicating the center of the footing. dozer (0 votes)
|
|
Excavating a FootingThe cinder blocks will be used as formwork for the footing. dozer (0 votes)
|
|
Column LayoutThe boards on the outside of the building area are for attaching the layout lines which indicate the positions of each footing/column. dozer (0 votes)
|
|
943 files on 79 page(s) |
|
|
|
|
|
|
|
|
77 | |
|
|
|
|