Top rated - House Construction |
The 3" hard wood is hammered into place to create a surface for the fascia board to be attached. dozer (0 votes)
|
|
More work on the roof. The cross members are set in place. The helper in blue is holding the ground while the foreman welds. dozer (0 votes)
|
|
The roof apex is 1.5 m above the prefabricated columns. Here the foreman is setting the roof apex in place. dozer (0 votes)
|
|
Here the foreman is doing the roof structure. The apex of the column is 4 meters (as can be seen imprinted on the top of the column) and is underground about 1 meter leaving about 3 meters. The stick is being used temporarily level the upper room beam. dozer (0 votes)
|
|
Fill Brought InShows the level of the dirt raised after fill is brought in via a tractor. The tractor was 500 per hour. dozer (0 votes)
|
|
Fill Dirt after PostsThis build used 4 meter tall prefabricated columns. They were set in footings and allowed to dry for 1 week, then fill dirt was brought in to raise the floor level. dozer (0 votes)
|
|
Small worker checks out the progress. dozer (0 votes)
|
|
Interior wall with electric sunken electric junction box. One row above the box there is a poured ring beam to add strength. dozer (0 votes)
|
|
Shower EnclosureThe water heater is a better quality Siebel® model. The enclosure has glass blocks (opaque) for a light and open feel. dozer (0 votes)
|
|
Exhaust FanThe wall mounted exhaust fans are more efficient than the ceiling mounted fans. There is plenty of light in the bathroom with a large window vent above and a row of colored glass blocks below. dozer (0 votes)
|
|
Dividing PanelThe dividing panel for the shower enclosure likewise has colored glass blocks to give more of an open feel. dozer (0 votes)
|
|
Water SystemThere is a artesian well (6 inch bore hole) in the far corner. At the bottom of the well is a submerged Franklin pump. The water is drawn into the 1750 liter underground water tank via a electronic solenoid. The pump on top of the water tank is a Mitsubishi 155 automatic water tank, which turns on when a tap is open in the system. Artesian wells are the best option for this area because they supply more and cleaner water than other solutions. The exterior wall is attractively rendered with premix die pigment, for a natural paint free surface and 'home made' feel.dozer (0 votes)
|
|