happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction

Top rated - House Construction
IMG_2275.jpg
Water TankWould never buy this type of water tank again because the drain pipe is above ground leaving any residue trapped in the bottom of the tank (as opposed to stainless tanks which sit on a stand and drain directly through the lowest point at the bottom of the tank). dozer00000
(0 votes)
IMG_2263.jpg
Orange Flexi TubingThe orange flexi tubing works great for hot water plumbing. With the fittings at over 100 b and the per meter cost at about 100 b it is normally not selected or used in most projects except those with the owner directly buying the materials. dozer00000
(0 votes)
IMG_2251.jpg
Vented Roof TileThe vented roof tile with plastic covering. The top will be cut for the stainless vents to go through and silicone sealed. dozer00000
(0 votes)
IMG_2006.jpg
Vent PipeThe 6 hun vent pipes to be extended up and routed through the specialty roof tiles which have an opening and plastic sleeve. dozer00000
(0 votes)
IMG_1983.jpg
Wall ShotThe walls are grooved for the vent pipes which will extend out through the roof. dozer00000
(0 votes)
IMG_1934.jpg
Vent PipesVend pipes extending upwards, eventually routed through the roof tiles. Venting into the attic space is not a good move as it creates a possible odor problem. dozer00000
(0 votes)
IMG_1897.jpg
Recessed Shower FlooringThe shower flooring is recessed to create a step down into the shower enclosure. dozer00000
(0 votes)
IMG_1896.jpg
Cementing the Shower FloorLaying concrete in the shower floor area. Notice the rebar mesh in the other shower floor area. dozer00000
(0 votes)
IMG_1881.jpg
Rough Bathroom LayoutsThe drain pipes for the floor drains are 3 inch, toilets are 4 inch, sinks are 1.5 inch. The purpose of the internal formwork is to later pour the shower floors since they will be a lower level. dozer00000
(0 votes)
IMG_1879.jpg
Bathroom LayoutBathroom nearing readiness to have the floors poured. The main floor will be poured first and then later the shower floors will be poured as they are at a lower level. dozer00000
(0 votes)
IMG_1875.jpg
Septic CoversScraping the bronze septic lids after the concrete walkway pour. dozer00000
(0 votes)
IMG_1858.jpg
6" Septic PVC Access and LidThe 6" Septic PVC access lid is covered in preparation for the walkway pour. Note the 6 hun vent pipe extending from the septic. It will be vented up through the wall and roof with the other vent pipes from the project. dozer00000
(0 votes)
943 files on 79 page(s) 67

Debug Info 
Debug Output: show / hide