|

Top rated - House Construction |

Water TankWould never buy this type of water tank again because the drain pipe is above ground leaving any residue trapped in the bottom of the tank (as opposed to stainless tanks which sit on a stand and drain directly through the lowest point at the bottom of the tank). dozer     (0 votes)
|
|

Orange Flexi TubingThe orange flexi tubing works great for hot water plumbing. With the fittings at over 100 b and the per meter cost at about 100 b it is normally not selected or used in most projects except those with the owner directly buying the materials. dozer     (0 votes)
|
|

Vented Roof TileThe vented roof tile with plastic covering. The top will be cut for the stainless vents to go through and silicone sealed. dozer     (0 votes)
|
|

Vent PipeThe 6 hun vent pipes to be extended up and routed through the specialty roof tiles which have an opening and plastic sleeve. dozer     (0 votes)
|
|

Wall ShotThe walls are grooved for the vent pipes which will extend out through the roof. dozer     (0 votes)
|
|

Vent PipesVend pipes extending upwards, eventually routed through the roof tiles. Venting into the attic space is not a good move as it creates a possible odor problem. dozer     (0 votes)
|
|

Recessed Shower FlooringThe shower flooring is recessed to create a step down into the shower enclosure. dozer     (0 votes)
|
|

Cementing the Shower FloorLaying concrete in the shower floor area. Notice the rebar mesh in the other shower floor area. dozer     (0 votes)
|
|

Rough Bathroom LayoutsThe drain pipes for the floor drains are 3 inch, toilets are 4 inch, sinks are 1.5 inch. The purpose of the internal formwork is to later pour the shower floors since they will be a lower level. dozer     (0 votes)
|
|

Bathroom LayoutBathroom nearing readiness to have the floors poured. The main floor will be poured first and then later the shower floors will be poured as they are at a lower level. dozer     (0 votes)
|
|

Septic CoversScraping the bronze septic lids after the concrete walkway pour. dozer     (0 votes)
|
|

6" Septic PVC Access and LidThe 6" Septic PVC access lid is covered in preparation for the walkway pour. Note the 6 hun vent pipe extending from the septic. It will be vented up through the wall and roof with the other vent pipes from the project. dozer     (0 votes)
|
|
943 files on 79 page(s) |
 |
 |
 |
 |
 |
67 |  |
 |
 |
 |
|

|
|
|