happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction

Top rated - House Construction
IMG_3418.jpg
Roof Overhang Too MuchThe roof overhang was too great allowing birds to enter in the area between the overhang and the fascia board.dozer00000
(0 votes)
IMG_2865.jpg
Roof InteriorAn interior view of the roof. dozer00000
(0 votes)
IMG_2297.jpg
Bird GuardThe bird guard is installed on the inside of the fascia board.dozer00000
(0 votes)
IMG_2176.jpg
Finished Roof TilesOne finished section of the roofing. Notice that the ridge tiles have not been affixed with any concrete per the dry tech method. dozer00000
(0 votes)
IMG_2175.jpg
Dry Tech at the Ridge CornerThe final layer of dry tech material being laid in place at the ridge corner. dozer00000
(0 votes)
IMG_2174.jpg
Dry Tech at the RidgeThe dry tech along the ridge. There are two levels of material which sit on an aluminum rail. dozer00000
(0 votes)
IMG_2173.jpg
Dry Teching the RidgeThe first layer of dry tech material is fitted on an aluminum rail on the ridge line by the dry tech installer. dozer00000
(0 votes)
IMG_2169.jpg
Dry TechThe two layers of dry tech materials being set in place by the installer. dozer00000
(0 votes)
IMG_2135.jpg
Prefab Valley MaterialThis is the chang prefabricated valley material as installed in a roof valley (shown from the inside). dozer00000
(0 votes)
IMG_2134.jpg
Angle Cutting TilesTiles are angle cut to fit into one of the the roof valleys . dozer00000
(0 votes)
IMG_2132.jpg
Lifting Tiles into PlaceThe tile guys are lifting the tiles into place and setting them on the battens. dozer00000
(0 votes)
IMG_2121.jpg
Plastic SheetingPlastic sheeting is laid down no top of the 20 mm plywood walkway to protect it from rain.dozer00000
(0 votes)
943 files on 79 page(s) 64

Debug Info 
Debug Output: show / hide