Top rated - House Construction |
Side view of the house, still partially finished. The bathroom is in the rear (with two glass blocks). dozer (0 votes)
|
|
Approximate wall thickness after rendering, about 8 cm. dozer (0 votes)
|
|
|
The interior after the pour of the floor and walls rendered. The floor was poured 8 - 10 cm and broomed rough in preparation for floor tiles. dozer (0 votes)
|
|
After the exterior walls have been rendered. dozer (0 votes)
|
|
The exterior prior to rendering the surface. dozer (0 votes)
|
|
With this type of roofing the are two parallel c sections done on each ridge. Notice also the roofing is affixed to the metal by using a u bolt which penetrates the roof sheeting. dozer (0 votes)
|
|
Galvanized metal that comes in a roll 90cm wide is used to form the gutter. It is shaped so that it has a 10 cm wide gutter area which fits in the two parallel roof c sections. dozer (0 votes)
|
|
At this stage the roofing has been done (notice if it was heavy roofing the walls would be completed first). dozer (0 votes)
|
|
Another shot showing the pour of the ground beam. The prefabricated columns have holes which allow the rebar to be affixed to the ground beam. You can see the rebar producing from the column at the 12 o'clock position. The columns are arowan block brand (premium). dozer (0 votes)
|
|
The form for the ground beam. The ground beam is dug out and formed using concrete blocks. The blocks will be left in the floor. dozer (0 votes)
|
|
Attaching the grc synthetic corrugated roofing board to the roof structure. Brand of roofing was Elephant, thickness 5 mm. Notice the parallel metal c sections used to form the gutter in the roof valley. dozer (0 votes)
|
|