happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction

Top rated - House Construction
IMG_2353.jpg
Tiling the Cabinet InteriorIn this case we used small white 4" tiles for the exterior and interior of the cabinets.dozer00000
(0 votes)
IMG_2342.jpg
Dryed StructureThe dried structure after the forms have been removed. dozer00000
(0 votes)
IMG_2341.jpg
Edged CornersThe corners of the cabinet and table top are edged and squared. dozer00000
(0 votes)
IMG_2339.jpg
Opening for Stove TopAn opening for the stovetop within the poured counter. dozer00000
(0 votes)
IMG_2338.jpg
Poured ConcreteThe concrete is poured within the formwork. dozer00000
(0 votes)
IMG_2336.jpg
Formwork for Sink and StoveThe areas formed off are for the stove top and sink as they will not be poured. dozer00000
(0 votes)
IMG_2334.jpg
Rebar for ConcreteThe rebar is laid out for the concrete top pour. The poured sub counter will be used to support a granite counter top. dozer00000
(0 votes)
IMG_2327.jpg
Cabinet WallsThe supporting walls for the counter are placed according to the design of where the lower doors will go. dozer00000
(0 votes)
IMG_2325.jpg
Outer SupportThe cabinet structure is made of red brick. The structure will support a U shaped counter. The outside frame will help support the weight of counter.dozer00000
(0 votes)
IMG_2684.jpg
Tile WashingThe tiles are always prepared by immersion in fresh water prior to being laid. dozer00000
(0 votes)
DSCN0362.jpg
Finished Granito TilesA finished section of granito floor tiles.dozer00000
(0 votes)
DSCN0360.jpg
Finished Bathroom SectionA finished section of the bathroom wall tiles.dozer00000
(0 votes)
943 files on 79 page(s) 58

Debug Info 
Debug Output: show / hide